PROVEN INFRASTRUCTURE

Powering Bangladesh's Electric Mobility

We engineer high-capacity DC fast charging networks, megawatt-scale solar arrays, and containerized battery storage systems built for industrial resilience.

GRID PERFORMANCE

Engineered for Absolute Uptime

45 MW+

Solar capacity installed

180+

DC fast chargers deployed

99.9%

Telemetry uptime SLA

12 MWh

BESS storage capacity

CLIENT TRUST

Validated by Industry Leaders

Fictional Technology delivered our 360kW DC charging hub ahead of schedule. Their high-voltage engineering and grid capacity management ensured flawless operation from day one.

Infrastructure Director, National Highway Authority

Integrating a 2MW rooftop solar array with BESS required deep technical capability. Fictive's EPC execution and grid-tied telemetry have optimized our factory's thermal and energy management.

Chief Operating Officer, Gazipur Textile Park

Partner with Bangladesh's premier EPC engineering team to secure your utility-scale power infrastructure.