ENGINEERING THE GRID

Powering Bangladesh's Electric Mobility

Connect with our Dhaka-based engineering team to initiate grid capacity assessments, site surveys, and utility-scale EPC proposals.

EPC INQUIRY

Initiate system design

Submit your facility parameters. Our high-voltage engineering team will review grid capacity, thermal constraints, and structural readiness.

DHAKA HEADQUARTERS

Engineering Command Center

Our central engineering office in Dhaka orchestrates telemetry monitoring, EPC execution, and rapid-response maintenance dispatch across the region.

Technical Operations

Direct support, structural site surveys, and grid-tied telemetry orchestration are managed directly from our central Dhaka operations facility.

24/7

Telemetry Monitoring

99.9%

Uptime SLA Support

TECHNICAL SPECIFICATIONS

Infrastructure FAQ

What is the typical timeline for a BESS or DC fast charger installation?

How is the 24/7 telemetry and uptime SLA managed?

Every installation is integrated with our grid-tied telemetry network. Our Dhaka control room monitors thermal loads, voltage stability, and charger status in real-time for immediate dispatch.

EPC execution typically spans 6 to 12 weeks, including comprehensive grid capacity analysis, local utility coordination, civil engineering, thermal management setup, and final commissioning.

Can we book a structural and electrical site survey?

Do you coordinate utility-scale grid connections?

Yes. As a full EPC partner, we handle complete substation design, high-voltage engineering, and official approvals with local power distribution companies in Bangladesh.

Absolutely. Use the form above to request an engineering site survey. Our team will evaluate your facility's structural readiness and electrical capacity.